With the Christmas break its been a few weeks since we went up to Crick to look at the boat and its was great to see so much progress and a real move towards the finishing touches. All the electrics are now complete, the solar panels installed etc and the woodwork looking great.
We had thought this might be the last visit before she is launched but we will be up in two weeks and will then have the final timetable. She gets launched before the floor goes down so that David can move the ballast around to adjust the trim and then the floor is laid, the doors go back on, the floor gets varnished and she sails up to the paintshop!
The utility area, great for dunking the dogs after they have rolled in something unmentionable!
Detail of the kitchen tiles
This natty cupboard will house the foot of the cross bed when not in use
The bed!
Wardrobe, bedside table
No comments:
Post a Comment